Planning estimate

₹3,62,000 for shell and fit-out.

Not a quotation. Land, transport, cranage, taxes, finance, and site works sit outside this table. A funding allowance of ₹4.5–5 lakh is the number to hold before those items.

Early conversations have used a ₹3.5 lakh class target. The line items below add up to ₹3,62,000. Both are targets.

Model P1 planning costs, Indian grouping.
Line₹
Main shell (RCC pipe or precast)₹70,000
Door, openings, and reinforcement₹30,000
Floor, lining, and insulation₹35,000
Bed, desk, and shelves₹20,000
Bathroom fixtures and waterproofing₹35,000
Plumbing and drainage₹20,000
AC, fan, and exhaust₹35,000
Mini fridge₹12,000
Electrical₹15,000
Water heater, sink, and microwave₹15,000
Labour and assembly₹35,000
Design, testing, and contingency₹40,000
Total₹3,62,000

Recommended funding allowance before land, transport, cranage, and site works. ₹4,50,000 to ₹5,00,000.