Skip to content
OPod IndiaSmall Space. Limitless Possibility.

4 · Model P1

One shell. Ten to twelve square metres.

Target occupancy is one person. Target shell is about 3 m in diameter and 4 m long. The planning fit-out is ₹3,62,000. Rental first.

Figures are design and financial targets, not supplier quotations. No unit of Model P1 has been built.

Bill of materials

Planning estimate. Recommended allowance before site works: ₹4,50,000–₹5,00,000.

ItemAmount
Main shell (RCC pipe or precast)₹70,000
Door, openings, and reinforcement₹30,000
Floor, lining, and insulation₹35,000
Bed, desk, and shelves₹20,000
Bathroom fixtures and waterproofing₹35,000
Plumbing and drainage₹20,000
AC, fan, and exhaust₹35,000
Mini fridge₹12,000
Electrical₹15,000
Water heater, sink, and microwave₹15,000
Labour and assembly₹35,000
Design, testing, and contingency₹40,000
Total₹3,62,000

ROI calculator

Hourly or overnight price, occupied nights, operating cost, and a monthly or yearly view. Simple payback only.

Monthly view

Revenue
₹20,000
Operating surplus
₹13,500
Simple payback
2.8 yrs

Simple payback is the investment divided by twelve months of operating surplus. Defaults for an overnight case are ₹1,000, 20 nights, ₹6,500 opex, and ₹4,50,000, which read ₹20,000, ₹13,500, and 2.8 yrs. This is not a quotation.